Quality Evaluation

Sellers

Service Types

Location

Slough

Project details

This project in Slough involved the installation of new tarmac surfacing alongside essential groundwork and drainage infrastructure. The objective was to create a durable, safe, and well-drained surface suitable for regular vehicle and pedestrian use within a busy commercial environment.

The project began with excavation and preparation works, including the installation of underground services such as drainage pipes. Trenches were carefully dug and pipework was positioned and secured to ensure effective water flow and long-term reliability. Backfilling and compaction were carried out to create a stable foundation for the surfacing layers.

Once the groundwork and drainage systems were in place, we moved on to preparing the base for the tarmac. This involved levelling and compacting the sub-base to ensure a consistent and supportive surface. Hot tarmac was then laid and spread evenly across the area, with attention given to achieving a smooth finish and clean transitions around existing structures, access points, and service covers.

The final surface provides a strong, weather-resistant finish designed to withstand daily use while maintaining a clean and professional appearance. Proper drainage integration ensures that water is effectively managed, reducing the risk of pooling or surface damage over time.

This project demonstrates our ability to deliver complete groundwork packages, combining drainage, preparation, and surfacing to produce high-quality, long-lasting results.

Planning a New Project?

Get in touch today.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
CTA Left Top Image
CTA Left Bottom Large ImageCTA Left Bottom Small Image
CTA Right Bottom Image

Delivering our clients more project clarity, greater insight, and less chaos.

Related Project Image

Residential brickwork construction completed across multiple units to structural stage.

Related Project Image

Footings and brickwork completed up to damp proof course level.

Related Project Image

Trench excavation with service installation and full tarmac reinstatement completed.

Related Project Image

Security fencing installation to protect site perimeter and control access.