Quality Evaluation

Sellers

Service Types

Location

Hastings

Project details

This project in Hastings involved the full construction of a new delivery bay, including demolition, groundwork preparation, and final tarmac surfacing. The aim was to create a durable and practical space capable of handling frequent use by delivery vehicles in a busy commercial environment.

We began by breaking out and removing the existing surface, clearing away old concrete and tarmac to expose the base layer. This allowed us to assess and prepare the ground properly before installing the new surface. All waste materials were removed from site, leaving a clean and stable area ready for reconstruction.

Following demolition, we carried out the groundwork phase, which included levelling, compacting, and preparing the sub-base to ensure long-term strength and stability. Particular attention was given to load-bearing requirements, as the delivery bay needed to withstand regular use from heavy vehicles.

Once the base was fully prepared, new tarmac was laid and finished to create a smooth, even surface with clean edges and defined parking and access areas. The layout was designed to improve vehicle flow and make the space more efficient for day-to-day operations.

The finished delivery bay provides a robust, weather-resistant surface that enhances both functionality and appearance. This project highlights our ability to deliver complete groundwork and surfacing solutions, from initial demolition through to the final finish, tailored to commercial requirements.

Planning a New Project?

Get in touch today.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
CTA Left Top Image
CTA Left Bottom Large ImageCTA Left Bottom Small Image
CTA Right Bottom Image

Delivering our clients more project clarity, greater insight, and less chaos.

Related Project Image

Residential brickwork construction completed across multiple units to structural stage.

Related Project Image

Footings and brickwork completed up to damp proof course level.

Related Project Image

Trench excavation with service installation and full tarmac reinstatement completed.

Related Project Image

Security fencing installation to protect site perimeter and control access.